Kent · King County
Post-Construction Cleanup in Kent, WA
Debris removal and final detail that gets the building ready to hand over.
- WA Contractor
- HERITBS745D6 · active through 2028
- general liability
- $2,000,000 general liability · Farmers
- Credentials
- Certificate of insurance sent before the first visit
Kent's valley builds big: warehouse shells and the office space attached to them, where a final clean covers a mezzanine office and a hundred thousand square feet of slab in the same visit. Those two halves need different equipment, and pretending otherwise is how a handover date slips.
About Kent
The Kent Valley holds one of the largest warehouse and distribution corridors on the West Coast, which means much of the commercial work here is office space attached to a working floor — break rooms that take real traffic, restrooms used by two shifts, and dust that arrives on a forklift. Up on East Hill the picture flips entirely to dense residential, with a large share of apartments and rentals that turn over often.
What post-construction cleanup covers

Post-construction is the only cleaning job with a deadline somebody else set. The certificate of occupancy, the tenant walkthrough, the open house — the date is fixed before we are called, and the clean is the last thing standing between the building and the people waiting for it.
Heritage does the full sequence: rough clean once the trades are out, then the final detail that actually gets inspected. Drywall dust out of tracks and returns, adhesive and sticker residue off glass and fixtures, paint flecks off hardware, and a floor that has been gone over enough times that it stops producing dust.
Priced per square foot after a walkthrough, with a $450 project minimum. Terms are Net 15. We quote the scope we can actually finish before your date rather than the number that wins the job and misses it.
Ideal for
- General contractors closing out a build
- Tenant improvement and office build-outs
- Retail and restaurant fit-outs before opening
- Renovations and unit remodels
- Developers preparing a handover walkthrough
What's included
- Construction debris and packaging removed from the space
- Drywall dust from ledges, tracks, vents, and returns
- Adhesive, sticker, and label residue off glass and fixtures
- Paint overspray and compound flecks off hardware
- Cabinetry and millwork cleaned inside and out
- Repeat floor passes until the surface stops shedding dust
Common questions
What is the minimum?
$450 per project. Below that the mobilisation costs more than the clean, and quoting under it would mean cutting the final detail — which is the part that gets inspected.
Do you do the rough clean and the final, or only one?
Either. Many contractors book both: a rough clean once the trades are out so the space can be worked in, then the final detail closer to the handover date. Booking both is usually cheaper than one heroic pass at the end.
Can you hit our certificate of occupancy date?
We will tell you honestly at the walkthrough. If the date does not leave room for the scope, we say so before you book rather than after. That is worth more to you than an optimistic yes.
Do you carry insurance for an active job site?
Yes. WA Contractor License HERITBS745D6 and $2,000,000 general liability aggregate through Farmers. We send the certificate to your GC or property manager before the first day on site.
Other services in Kent
Get a real quote, not a guess.
Tell us about the space and we will come back with a written scope and a number. No obligation, and no pressure if the answer turns out to be no.